Tindakan pencegahan untuk pemasangan dan mesin uji mesin peledakan tembakan tipe kait(一)

- 2021-06-03-

Itumesin peledakan tembakan tipe kaitumumnya memiliki penampilan yang lebih besar, dan proses pemasangannya relatif lebih rumit daripada peralatan kecil. Pemasangan yang benar dan mesin uji adalah kunci untuk memastikan pengoperasian normal peralatan selanjutnya. Dalam kasus operasi awal yang tidak terampil, pengguna diminta untuk secara ketat mengikuti instruksi dari personel yang relevan atau mengacu pada instruksi. Pengoperasian yang tidak sah dapat dengan mudah menyebabkan kerusakan permanen padamesin peledakan tembakan kait. Itushot blasting machine manufacturer has sorted out the precautions for installation and test machine to share with you. I hope it will be helpful to users who use the device for the first time.
1. Installation. Itumesin peledakan tembakan tipe kait is installed and debugged in the production plant and disassembled into several parts before being transported to the user site for installation. Although there is no pit, the foundation must be firm, the anchor bolt holes must be standardized, and the chamber body must be adjusted. After the second irrigation, the anchor bolt nuts can be tightened after solidification. After the chamber body is fixed, the various parts can be installed. Ituprecautions for the installation and debugging of the relevant components are introduced below.
1. Perangkat peledakan tembakan:
Itushot blasting device has been installed on the chamber body before leaving the factory. Please pay attention to the problems to be debugged before use. Check whether the fixed positions of the blade, the pill wheel, the directional sleeve, and the guard plate are accurate and firm, and check whether the direction of rotation is correct after power on. Then adjust the position of the directional sleeve opening. Theoretically, the angle between the front edge of the directional opening and the front edge of the blade throwing position is about 900. After fixing the position of the directional sleeve, the position of the projectile belt can be detected by hanging Place a steel plate or wooden board on the position of the workpiece facing the exit of the shot blasting machine, start the shot blasting machine, put a small amount (2-5kg) of projectiles into the blasting tube, and then stop, check whether the hit position on the steel plate is suitable for the needs, such as Close the window of the bias-adjustable directional sleeve downwards, and vice versa, until it fits, and note the position of the directional sleeve opening as a basis for future replacement of the directional sleeve.
2. Kerekan dan konveyor sekrup:
Pertama-tama lakukan uji tanpa beban untuk memeriksa apakah bucket pengangkat dan bilah spiral berjalan ke arah yang benar, kemudian kencangkan sabuk kerekan hingga tingkat tegangan sedang untuk menghindari penyimpangan, dan kemudian lakukan uji beban untuk memeriksa operasi dan kapasitas pengangkutan, apakah ada keanehan Kebisingan dan getaran, periksa dan singkirkan rintangan.
3. Pemisah pil-pasir:
Pertama periksa apakah gerakan ram fleksibel, dan kemudian periksa posisi pelat pemisah yang tepat, kemudian ketika kerekan dimuat dan di-debug, ada aliran masuk tembakan baja yang terus menerus, dan periksa apakah tembakan baja mengalir keluar dan jatuh ketika parasut dilepaskan